We are almost done with the brick work downstairs. All that is left is to brush the brick, vacuum everything, and then seal it.

UNADJUSTEDNONRAW thumb 3547UNADJUSTEDNONRAW thumb 3550UNADJUSTEDNONRAW thumb 3549UNADJUSTEDNONRAW thumb 354d

The floor is still coming along. This week they should finish the subfloor and continue to relay the original flooring back down before sanding and sealing.

UNADJUSTEDNONRAW thumb 354a

Slowly it’s getting cleaned up.

UNADJUSTEDNONRAW thumb 3546UNADJUSTEDNONRAW thumb 354eUNADJUSTEDNONRAW thumb 354c