The 1st floor retail area restoration continues. Here is the East wall brick repair and repointing.
![]()
The bricks are three levels thick. Notice how some of the bricks in the middle level are collapsing.
![]()
An overview of the East wall restoration.
![]()
![]()
The West wall restoration.
![]()
And finally the floor restoration.
Here is where our contractor is tying the restored floors into the original flooring.![]()
The brick work should be completed in the next few days. The flooring restoration will be at least another week. Afterwards we will seal the brick, stain/seal the floors, and finishing painting the walls and ceiling.