We are almost done with the brick work downstairs. All that is left is to brush the brick, vacuum everything, and then seal it.
![]()
![]()
![]()
![]()
The floor is still coming along. This week they should finish the subfloor and continue to relay the original flooring back down before sanding and sealing.
![]()
Slowly it’s getting cleaned up.
![]()
![]()
![]()