The repair work is almost complete downstairs. Everything is buttoned up and all that is left is the false louvers above the windows.
![]()
Half of them are complete. Our painter will then clean everything up and paint the complete front. It will be the same yellow with white trim as above.
![]()
Inside we still need to mount dry wall and have it painted. That will be in the next two weeks also.
![]()
![]()
No Comments