The downstairs flooring continues. We finished exposing the broken floor joists and now we are cleaning up all the trash, old wood, and broken bricks left over from the years.
![]()
We are having to replace almost all of the floor joists on the east wall.
![]()
And here is the final pile of wood we saved. We will need to remove the nails, plane/even them up, and then our contractor will reuse them above the new subfloor/floor joists.
![]()
Along with the flooring we continue with our numerous projects. We found some bar stools for upstairs. We removed the seat pads and are having them recovered.
![]()
And finally an overview of the upstairs from when you walk up the south-side stairway. Things are coming together.
![]()
Brandy Hudgins
April 22, 2019 at 7:33 amI’ve been loving the updates. I have lived in Clebune for 27 years and have always had a sentimental heart for our old buildings in downtown. Thank you for bring the “comic box” back to life.